宝贝把腿张开我要添你下边l,拍国新自产最拍偷,久久精品国产亚洲Av久,97在线视频免费观看

State Grid article 15 UHV completed and put into operation!

Article From:HENAN CHANGZHENG ELECTRIC CO., LTD

At 11:00 on August 14, 2017, Yuheng-Weifang 1000 kV UHV AC power transmission and transformation project successfully completed 72-hour trial operation and was officially put into operation.


Engineering archives

· Substation capacity: 15 million kVA

· Line length: 2×1050 km

· Build new substations in Jinzhong, Shijiazhuang, Weifang and Yuheng Switch stations, and expand Jinan substation

· It is the UHV AC project with the largest construction scale and longest transmission distance so far

2015/05/06 Approved by National Development and Reform Commission

2015/05/12 Construction started

2017/05/18 System commissioning started

2017/08/14 Put into operation

Engineering significance

1. Grid structure

The west of the project is connected to the coal power base of Shaanxi and Shanxi, and the east is connected to the Zalute-Qingzhou UHV Direct current project and the Ximan-Shandong UHV AC project, which is an important part of the UHV network in North China.

2. Balance between supply and demand

After the project is put into operation, it is of great significance to improve the power transmission capacity of Shaanxi and Shanxi, meet the load growth demand of Hebei and Shandong power networks, strengthen the power grid support role of UHV DC projects, and improve the ecological environment quality in North China.

此模塊ID后臺未找到,請在后臺-首頁模板中修改!